
Our Facilities
We are based in Tuas, Singapore, with a total combined floor space of over 11,000m2.
Our production facilities are supported by state-of-the-art CNC machines with overhead cranes providing access to all corners of the factory for optimal usage of space.
Our monthly capacity, based on a single shift, is as follows:- Cladding – 12,000m2/ month
- Unitized Curtain-wall – 7,500m2/ month, approx 50 panels/day
Our comprehensive aluminium manufacturing facility is situated at No. 4, Gul Street 1. Within this location, the fabrication is carried out in a controlled and efficient manner, minimising double-handling, transportation and time lost due to any outsourcing processes.
No. 9, Gul Street 1 is used mainly for raw material storage and steel works.